Adam Grade Seperator – Road 437/60
The project's description
As part of this project, safety and traffic improvements will be made at the intersection of Adam Roundabout through 437/60.
Purpose of the project:
Separate level between the main traffic that connects Beit El and Jerusalem with the secondary traffic
to Ramallah and Geva Binyamin.
The project includes the following components:
- Road 60-437 on the lower level – single-route, one-lane for each way.
- A round junction for connecting the ramps and roads to Ramallah and Geva Binyamin.
- Connecting ramps to the main axis.
- Construction of a bridge.
Additional details
- Client
- National Roads Company of Israel
- Project activities
- Execution and supervision management
- What's in the project
- Ramps, grade separator, traffic circle, bridge
- Financial Scope
- 80,000,000 NIS